Corn Chips Nachos Chips Production Line

  • Corn Chips Nachos Chips Production Line
  • Corn Chips Nachos Chips Production Line
  • Corn Chips Nachos Chips Production Line
  • Corn Chips Nachos Chips Production Line
  • Corn Chips Nachos Chips Production Line
  • Corn Chips Nachos Chips Production Line
  • video
Corn Chips Nachos Chips Production Line
  • +8618753110771
  • We provide overseas installation service
  • L/C,D/A,D/P,T/T,Western Union,Money Gram payments for offline orders.
  • 150-200kg/h,250-350kg/h

1.Certification: CE ISO SGS.
2.Motor:Siemens, ABB or Chinese Brand.
3.Formula: Free to buyers.
4.Advantage: Professional engineer team,steady quality,customization service.
5.Energy Source: Electricity,Diesel Oil, Gas.
6.After-sales Service Provided: Free spare parts, Field installation,Commissioning and training, Field maintenance and repair service, Video technical support, Online support.

1.Product Description

Doritos Chips Nachos Chips Production Line

Doritos,Tortilla,Nachos, Corn chips‘ main raw material are using corn powder, the mixture is heated under pressure, and then extruded through a die, then use the shaper to make it, the texture of the snack is formed as a result of contact with hot air, causing steam in the mixture to expand and creating its characteristic texture. After frying, the product is then tumbled with the desired flavor components.

Flow chart :

grinding→mixing→extruding→cuttingfrying→flavoring→cooling→packaging

nachos chips production line


doritos chips


Flow chart diagram:

Our engineer could design the layout drawing according to your dimension of the factory for the fish feed machines

Machine Model Parameters


ModleInstalled Power(kw)Power Consumption(kw)Throughput(kg/h)Dimension(m)
65 Processing Line4530150~20018x4.5x3.4
75 Processing Line8050250~35026x5x3.5

Machine Detail Parameters


Name

Doritos Chips Nachos Chips Production Line

Material

Food grade stainless steel

Whole line size

About 20*4*4m(Free workshop design drawing)

Weight

3000-6000kg

Working Power

Need 3 phases Voltage . 380V 50Hz or customized

Worker required

2-3 workers

Packing Way

Wooden case

Payment Terms

T/T 30% as down payment, 70% before Shipment.

Delivery Time

About 10-20 working days

Warranty

One year

Installation

 

1) If needed we can arrange one engineer to customer`s factory to help install the machinery and train workers operating machine;

2) The Installed engineers has more than 10 years experience in extrusion production;

3) We provide video guidance for installation;

4) We provide customer plant design and renovation solutions

5) We provide the basic formula;

6) The raw material, workshop electric source should be well prepared before installation. the installation period is about 7-15 days.

Service

Free spare parts, Field installation,Commissioning and training, Field maintenance and repair service, Video technical support, Online support.


Sample of snack food :

nachos chips production line

2.FAQ

Q: Are you a trade company or a manufacturer? 
A: we are a manufacturer, welcome to visit and check the machine to my factory. 
Q: How long is your delivery time? 
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for a 10-day period installation and training to the operators.
Q:do you supply any formula to buyer?
A:yes, we supply formula to buyer,

3.  Our  Company

doritos production line

nachos chips production line

4.Contact us

Mobile/Whatsapp/Wechat:+8618753110771

Tel:+8618753110771

Skype:+8618753110771

Email:director@brtbrightmachine.com

          info@brtbrightmachine.com

          kate@brtbrightmachine.com

Jinan Bright Machinery CO.,LTD

Address:Wande Industry Park,Jinan City, Shandong Province,China


doritos chips



FAQ
How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity....more
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right