Corn Chips Nachos Chips Production Line
- +8618753110771
- We provide overseas installation service
- L/C,D/A,D/P,T/T,Western Union,Money Gram payments for offline orders.
- 150-200kg/h,250-350kg/h
1.Certification: CE ISO SGS.
2.Motor:Siemens, ABB or Chinese Brand.
3.Formula: Free to buyers.
4.Advantage: Professional engineer team,steady quality,customization service.
5.Energy Source: Electricity,Diesel Oil, Gas.
6.After-sales Service Provided: Free spare parts, Field installation,Commissioning and training, Field maintenance and repair service, Video technical support, Online support.
Doritos Chips Nachos Chips Production Line
Doritos,Tortilla,Nachos, Corn chips‘ main raw material are using corn powder, the mixture is heated under pressure, and then extruded through a die, then use the shaper to make it, the texture of the snack is formed as a result of contact with hot air, causing steam in the mixture to expand and creating its characteristic texture. After frying, the product is then tumbled with the desired flavor components.
Flow chart :
grinding→mixing→extruding→cutting→frying→flavoring→cooling→packaging
Flow chart diagram:
Our engineer could design the layout drawing according to your dimension of the factory for the fish feed machines
Machine Model Parameters
Modle | Installed Power(kw) | Power Consumption(kw) | Throughput(kg/h) | Dimension(m) |
65 Processing Line | 45 | 30 | 150~200 | 18x4.5x3.4 |
75 Processing Line | 80 | 50 | 250~350 | 26x5x3.5 |
Machine Detail Parameters
Name | Doritos Chips Nachos Chips Production Line |
Material | Food grade stainless steel |
Whole line size | About 20*4*4m(Free workshop design drawing) |
Weight | 3000-6000kg |
Working Power | Need 3 phases Voltage . 380V 50Hz or customized |
Worker required | 2-3 workers |
Packing Way | Wooden case |
Payment Terms | T/T 30% as down payment, 70% before Shipment. |
Delivery Time | About 10-20 working days |
Warranty | One year |
Installation |
1) If needed we can arrange one engineer to customer`s factory to help install the machinery and train workers operating machine; 2) The Installed engineers has more than 10 years experience in extrusion production; 3) We provide video guidance for installation; 4) We provide customer plant design and renovation solutions 5) We provide the basic formula; 6) The raw material, workshop electric source should be well prepared before installation. the installation period is about 7-15 days. |
Service | Free spare parts, Field installation,Commissioning and training, Field maintenance and repair service, Video technical support, Online support. |
Sample of snack food :
2.FAQ
Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit and check the machine to my factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for a 10-day period installation and training to the operators.
Q:do you supply any formula to buyer?
A:yes, we supply formula to buyer,
3. Our Company
4.Contact us
Mobile/Whatsapp/Wechat:+8618753110771
Tel:+8618753110771
Skype:+8618753110771
Email:director@brtbrightmachine.com
info@brtbrightmachine.com
kate@brtbrightmachine.com
Jinan Bright Machinery CO.,LTD
Address:Wande Industry Park,Jinan City, Shandong Province,China