Hot Cheetos Snacks Chips Making Machine

  • Hot Cheetos Snacks Chips Making Machine
  • Hot Cheetos Snacks Chips Making Machine
  • Hot Cheetos Snacks Chips Making Machine
  • Hot Cheetos Snacks Chips Making Machine
  • Hot Cheetos Snacks Chips Making Machine
  • Hot Cheetos Snacks Chips Making Machine
Hot Cheetos Snacks Chips Making Machine
  • +8615216413539
  • We provide overseas installation service
  • L/C,D/A,D/P,T/T,Western Union,Money Gram payments for offline orders.
  • 100-200kg/h

1.Certification: CE ISO SGS.
2.Motor:Siemens, ABB or Chinese Brand.
3.Formula: Free to buyers.
4.Advantage: Professional engineer team,steady quality,customization service.
5.Energy Source: Electricity,Diesel Oil, Gas.
6.After-sales Service Provided: Free spare parts, Field installation,Commissioning and training, Field maintenance and repair service, Video technical support, Online support.

1.Product Description

Hot Cheetos Snacks Chips Making Machine

Cheetos is a special extruded snack with extreme crispy taste. The main raw material is corn grits which is mixed with water evenly by the flour mixer, squeezed and twisted by the extruder to form the iregular curls shape, and then cut into different length, at last fried or baked and flavored. Such snacks with rich taste are always the customer's favor.

cheetos Making Machine

cheetos snacks Making Machine

Flow chart :

grinding→mixing→extruding→drying→flavoring→cooling→packaging

Flow chart diagram:

Machine Model Parameters:

ModleInstalled Power(kw)Power Consumption(kw)Output(kg/h)Dimension(m)
76 Processing Line4530-70100~20018x4.5x3.4

Machine Detail Parameters:


Name

Hot Cheetos Snacks Chips Making Machine

Material

Food grade stainless steel

Whole line size

About 20*4*4m(Free workshop design drawing)

Weight

3000-6000kg

Working Power

Need 3 phases Voltage . 380V 50Hz or customized

Worker required

2-3 workers

Packing Way

Wooden case

Payment Terms

T/T 30% as down payment, 70% before Shipment.

Delivery Time

About 10-20 working days

Warranty

One year

Installation

 

1) If needed we can arrange one engineer to customer`s factory to help install the machinery and train workers operating machine;

2) The Installed engineers has more than 10 years experience in extrusion production;

3) We provide video guidance for installation;

4) We provide customer plant design and renovation solutions

5) We provide the basic formula;

6) The raw material, workshop electric source should be well prepared before installation. the installation period is about 7-15 days.

Service

Free spare parts, Field installation,Commissioning and training, Field maintenance and repair service, Video technical support, Online support.


Sample of snack food :

2.FAQ

Q: Are you a trade company or a manufacturer? 
A: we are a manufacturer, welcome to visit and check the machine to my factory. 
Q: How long is your delivery time? 
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for a 10-day period installation and training to the operators.
Q:do you supply any formula to buyer?
A:yes, we supply formula to buyer,

3.Our Customer

cheetos snacks Making Machine

4.Contact us

Mobile/Whatsapp/Wechat: +8615216413539

Tel:+8615216413539

Skype:+8615216413539

Email:director@brtbrightmachine.com

          info@brtbrightmachine.com

          kate@brtbrightmachine.com

Jinan Bright Machinery CO.,LTD

Address:Wande Industry Park,Jinan City, Shandong Province,China

cheetos chips Making Machine


FAQ
How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity....more
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right